Here are the theory test questions for A02 Crawler Crane above 10 tonnes.
During the theory test you'll be asked a maximum of 40 questions.
Please note that your paper will include all the questions we have marked here with an asterisk *. In addition you will have a random selection of the other questions that are not marked here with an asterisk.
These questions will appear on every A02 paper
When would a fly jib or lattice extension be fitted and used? (1 marks)*
If asked to travel with a suspended load, name FIVE factors that must be taken into account by the operator before moving. (5 marks)*
The operator has been asked to drive the crane onto a transporter/trailer. a) Who is responsible for the loading operations and b) state FOUR actions to be considered by the operator before loading commences. (5 marks)*
What is the purpose of the hoisting limit switch (also known as the ‘chandelier’)? (1 marks)*
If setting up to lift loads in a pedestrianised area, state THREE factors that need to be taken into account. (3 marks)*
The number of falls has been changed on the hook block. How has this action affected the RCI? (2 marks)*
Which parts of the crane is the radius (for lifting) measured from? (2 marks)*
A crawler crane has been delivered to site, assembled and configured for lifting. What must be carried out before lifting starts and by whom? (2 marks)*
If radios are to be used during the lifting operations, what FIVE actions and checks must be made by the crane operator before use? (5 marks)*
a) How does the number of lines or falls of rope affect the lifting capacity for the crane and
b) how is hoist speed affected when the number of lines (or falls of rope) is reduced? (2 marks)*
If a load of 40 tonnes is lifted on four falls or lines of rope, what is the tension in each fall or line? (1 marks)*
a) Which part of the crane applies loading or pressure to the ground and b) name TWO ways that pressure can be reduced. (3 marks)*
Name TWO things that happen if the hoist rope is not vertical when lifting a load. (2 marks)*
Describe THREE stages and relevant actions that a crane operator undertakes during pre-use inspections, and required action if a defect is found? (3 marks)*
Using the lifting capacity diagram for A02: a) what is the maximum lifting capacity and b) what is the lifting capacity in kg at 24 metre radius using a 32 metre boom/ jib? (4 marks)*
A random selection of these questions will appear on each A02 paper
What is the main purpose of the Rated Capacity Indicator (RCI)? (3 marks)
a) What is meant by the lifting capacity of the crane and
b) who determines it? (2 marks)
Why should a crane be re-fuelled at the end of the day? (1 marks)
The operator has to use a new model of crawler crane that they are unfamiliar with. What do Regulations (i.e. LOLER 98) and other guidance require the operator to have? (3 marks)
How does the rope or line length affect load swings? (1 marks)
What is the purpose of counterweight(s) on the crane? (1 marks)
If fitted, why should the seat belt be worn, even with the cab door closed? (2 marks)
When parking the crane at the end of the shift, name THREE places where the machine should NOT be parked. (3 marks)
What makes up the total (or gross) weight of a load that is to be lifted? (3 marks)
On cranes fitted with two travel levers, if both travel levers are pushed forwards when the track motor/drive sprockets are in front of the cab, traditionally, in which direction would the machine move? (2 marks)
Give FOUR reasons that may cause the crane to overturn. (4 marks)
Name THREE ways in which wind speed can affect the lifting operation. (3 marks)
What is the purpose of a roll or ROPS frame? (2 marks)
When working in a confined area or space: a) what danger can be present with regards to the counterweight of the machine, b) when should measures be taken and c) what measures should be implemented? (3 marks)
Only two legs of an 8 tonne four-legged chain sling are being used. What is the maximum load that can be lifted? (1 marks)
Before leaving the cab for a rest break, after parking and switching off the machine, what final action must be carried out? (2 marks)
If the hook block inadvertently (accidentally) lands, what course of action should be taken? (2 marks)
How does the deflection of the boom or jib affect the lift? (2 marks)
What effect can a swinging load have on a crane? (1 marks)
If assisting in fitting a fly jib to the crane, why is it important that the manufacturers' procedures are followed precisely? (2 marks)
Wind speeds can be variable throughout the working day. What action must be taken to ensure safe working conditions are maintained? (1 marks)
During work, the engine starts to overheat. Explain the danger if someone tries to remove the radiator or expansion tank cap. (2 marks)
a) What determines the minimum distances that any part of plant and machinery has to be kept from over head electricity lines and
b) explain why a distance should be kept. (4 marks)
When MUST a banksman or signaller be used before moving a crane? (2 marks)
If a load is slewed rather quickly, what TWO initial effects does it have on the load whilst slewing? (2 marks)
Two cranes are working in the same vicinity that encroach the operating radius of each. What actions would the lift plan or method statement normally specify? (3 marks)
If checking the oil level using a dipstick, why must gloves be worn? (1 marks)
State the functions or job role of the following personnel: a) Appointed Person, b) Crane Supervisor, c) Slinger, d) Signaller. (4 marks)
If the words STOP NOW are given to the crane operator by radio during the lift, what action must the operator take? (2 marks)
a) What is the minimum distance allowed near open trenches when travelling the crane and
b) explain why? (2 marks)
Although not best practice, state the possible effect if lifting a load whilst facing downhill on a slope. (1 marks)
When slewing with a load, where should the operator be looking? (1 marks)
On a busy construction site, how would the slinger/signaller be identified to the crane operator? (1 marks)
In what situation does a hard hat NOT need to be worn when operating a crawler crane? (2 marks)
During the lifting operation, part of the task cannot be carried out as detailed in the lift plan. a) What initially must happen to the lifting operation and b) who authorises any changes? (2 marks)
Give TWO examples of where The Work at Height Regulations may apply to crawler crane operations. (2 marks)
The safe working load or working load limit (SWL/WLL) of a multi-leg chain sling only applies in what TWO conditions or configuration? (2 marks)
If a load is slewed too fast for its size, what TWO factors must the operator and signaller take into account? (4 marks)
What is the difference between a contract lift and a ‘standard’ crane hire? (2 marks)
End of questions for A02 Crawler Crane above 10 tonnes